Skip to content

Netlist editing fix EDA-2602, EDA-2608 (#1601) #6558

Netlist editing fix EDA-2602, EDA-2608 (#1601)

Netlist editing fix EDA-2602, EDA-2608 (#1601) #6558

Triggered via push March 20, 2024 18:57
Status Cancelled
Total duration 3m 47s
Artifacts

main.yml

on: push
msys2-gcc
0s
msys2-gcc
windows-msvc
0s
windows-msvc
macos-gcc
0s
macos-gcc
macos-clang
0s
macos-clang
CodeFormatting
21s
CodeFormatting
ClangTidy
0s
ClangTidy
Matrix: centos7-gcc
Matrix: linux-gcc
Fit to window
Zoom out
Zoom in

Annotations

15 errors
centos7-regression
Process completed with exit code 100.
ubuntu-valgrind
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-solver
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-production
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-test/batch_gen2
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-test
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-test/batch
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-install
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
ubuntu-regression
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
centos7-production
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
centos7-production
The operation was canceled.
centos7-test
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
centos7-test
The operation was canceled.
CodeFormatting
Canceling since a higher priority waiting request for 'main-refs/heads/main' exists
CodeFormatting
The operation was canceled.