Migrate multiple vuex stores to pinia #256
Open
DCO-2 / DCO
succeeded
Jan 21, 2025 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
Sha | Message | Pass or fail reason | |
---|---|---|---|
🟢 | 5d3adc2 | Beginning of migrating from vuex to pinia | Valid sign-off found |
🟢 | 3448de9 | Fix error with EntityResults not properly displayi... | Valid sign-off found |
🟢 | 345f1b0 | Added missing pinia stores | Valid sign-off found |
🟢 | 2e362a6 | Fix entity results now using pinia properly | Valid sign-off found |
🟢 | e798877 | migrate statistics from vuex to pinia | Valid sign-off found |
🟢 | de8459c | Merge branch 'main' into migrate-to-vite | Skipped: sign-off not required in merge commit |
🟢 | 4dbfd1b | Migrate entity store to pinia | Valid sign-off found |
Loading