Skip to content

chore(deps): update dependency lint-staged to v13.3.0 #1098

chore(deps): update dependency lint-staged to v13.3.0

chore(deps): update dependency lint-staged to v13.3.0 #1098

Triggered via pull request October 14, 2023 15:11
Status Failure
Total duration 1m 18s
Artifacts

verify.yml

on: pull_request
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

6 errors
verify (ubuntu-latest, 14)
Process completed with exit code 1.
verify (ubuntu-latest, 16)
The job was canceled because "ubuntu-latest_14" failed.
verify (windows-latest, 14)
The job was canceled because "ubuntu-latest_14" failed.
verify (windows-latest, 14)
The operation was canceled.
verify (windows-latest, 16)
The job was canceled because "ubuntu-latest_14" failed.
verify (windows-latest, 16)
The operation was canceled.