Skip to content

Tweaks the dependencies #79

Tweaks the dependencies

Tweaks the dependencies #79

Triggered via push March 6, 2024 00:30
Status Failure
Total duration 33s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

24 errors
P8.2 - L11.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Only one of these can be installed: laravel/framework[dev-master], illuminate/contracts[v9.0.0-beta.1, ..., 9.x-dev, v10.0.0, ..., 10.x-dev]. laravel/framework replaces illuminate/contracts and thus cannot coexist with it. - laravel/framework 11.x-dev is an alias of laravel/framework dev-master and thus requires it to be installed too. - Root composer.json requires laravel/framework 11.* -> satisfiable by laravel/framework[11.x-dev (alias of dev-master)]. - Root composer.json requires illuminate/contracts ^9.0|^10.0 -> satisfiable by illuminate/contracts[v9.0.0-beta.1, ..., 9.x-dev, v10.0.0, ..., 10.x-dev].
P8.2 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.1 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.1 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_11____2" failed.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.