-
Notifications
You must be signed in to change notification settings - Fork 721
Pull requests: tikv/pd
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[WIP] *: update kvproto
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#8816
opened Nov 15, 2024 by
overvenus
Loading…
*: fix Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
TestWatcher
dco-signoff: yes
#8812
opened Nov 14, 2024 by
rleungx
Loading…
region: check if the query startkey and endkey specify an uncovered region
dco-signoff: yes
Indicates the PR's author has signed the dco.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8790
opened Nov 7, 2024 by
JackL9u
Loading…
etcd/path: change leaderPath/dcLocationPath/memberPath/allocalIDPath to absolute path
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#8789
opened Nov 7, 2024 by
okJiang
Loading…
*: reduce raft cluster lock and replace some place with atomic
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8786
opened Nov 7, 2024 by
lhy1024
Loading…
*: remove api mode
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
dr-autosync: add recover timeout (#6295)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-7.5
This PR is cherry-picked to release-7.5 from a source PR.
#8776
opened Nov 6, 2024 by
ti-chi-bot
Loading…
chore(dashboard): update TiDB Dashboard to v8.5.0-bce95733 [master] (#8764)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#8772
opened Nov 5, 2024 by
ti-chi-bot
Loading…
build(deps): bump github.com/golang-jwt/jwt/v4 from 4.4.2 to 4.5.1 in /tests/integrations
approved
dco-signoff: yes
Indicates the PR's author has signed the dco.
dependencies
Pull requests that update a dependency file
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8771
opened Nov 4, 2024 by
dependabot
bot
Loading…
chore(dashboard): update TiDB Dashboard to v6.5.12-7d37156c [release-6.5]
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8766
opened Nov 4, 2024 by
baurine
Loading…
chore(dashboard): update TiDB Dashboard to v7.5.5-a2486d76 [release-7.5]
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#8765
opened Nov 4, 2024 by
baurine
Loading…
[DNM]: test ci on release-8.5
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8761
opened Nov 1, 2024 by
purelind
Loading…
scheduler: add test for creating evict-leader-scheduler twice
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-cherry-pick-release-6.5
Should cherry pick this PR to release-6.5 branch.
needs-cherry-pick-release-7.1
Should cherry pick this PR to release-7.1 branch.
needs-cherry-pick-release-7.5
Should cherry pick this PR to release-7.5 branch.
needs-cherry-pick-release-8.1
Should cherry pick this PR to release-8.1 branch.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8757
opened Oct 31, 2024 by
okJiang
Loading…
api: fix cannot dump trace (#7255)
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#8754
opened Oct 30, 2024 by
ti-chi-bot
Loading…
api: support to query whether pd has loaded region
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#8749
opened Oct 28, 2024 by
lhy1024
Loading…
scheduler: add metrics when there is potential reverse
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8741
opened Oct 23, 2024 by
lhy1024
Loading…
[DNM] Apply pd patch from https://github.com/tikv/pd/pull/8614
dco-signoff: no
Indicates the PR's author has not signed dco.
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#8730
opened Oct 18, 2024 by
HaoW30
Loading…
*: introduce QueryRegion stream
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
grpc: add caller info to client and wrap innerClient
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#8704
opened Oct 15, 2024 by
okJiang
Loading…
operator/operator_controller: remove redundant logic introduced by #6427
dco-signoff: yes
Indicates the PR's author has signed the dco.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#8697
opened Oct 12, 2024 by
AndreMouche
Loading…
client: support configuring backoff
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#8679
opened Oct 9, 2024 by
rleungx
Loading…
*: reset config if the input is invalid (#8632)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-6.1
This PR is cherry-picked to release-6.1 from a source PR.
#8662
opened Sep 24, 2024 by
ti-chi-bot
Loading…
*: reset config if the input is invalid (#8632)
cherry-pick-approved
Cherry pick PR approved by release team.
dco-signoff: yes
Indicates the PR's author has signed the dco.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#8661
opened Sep 24, 2024 by
ti-chi-bot
Loading…
client: Support both sync and async interface for tsoStream, to avoid potential performane regression when concurrent RPC is not enabled
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#8636
opened Sep 18, 2024 by
MyonKeminta
•
Draft
[DNM] skip evict leader for v7.5.1
dco-signoff: yes
Indicates the PR's author has signed the dco.
do-not-merge/needs-linked-issue
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#8614
opened Sep 10, 2024 by
rleungx
Loading…
Previous Next
ProTip!
Add no:assignee to see everything that’s not assigned.