Improve logging #83
Re-run triggered
September 16, 2024 17:11
Status
Cancelled
Total duration
1d 8h 51m 44s
Billable time
28m
Artifacts
–
Annotations
3 errors and 4 warnings
Integration tests (macos-13-xl)
The hosted runner encountered an error while running your job. (Error Type: Disconnect).
|
Integration tests (macos-12)
The hosted runner encountered an error while running your job. (Error Type: Disconnect).
|
Integration tests (macos-11)
This request was automatically failed because there were no enabled runners online to process the request for more than 1 days.
|
Integration tests (macos-13-xl)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|
Integration tests (macos-12)
Received request to deprovision: The request was cancelled by the remote provider.
|
Integration tests (macos-12)
qemu 9.1.0 is already installed and up-to-date.
To reinstall 9.1.0, run:
brew reinstall qemu
|
Integration tests (macos-12)
jq 1.7.1 is already installed and up-to-date.
To reinstall 1.7.1, run:
brew reinstall jq
|