Skip to content

Improved Lift instances for Path/OsPath types #62

Improved Lift instances for Path/OsPath types

Improved Lift instances for Path/OsPath types #62

Triggered via pull request September 11, 2024 23:33
Status Failure
Total duration 6m 59s
Artifacts

ci.yaml

on: pull_request
Matrix: cabal
Matrix: stack
Fit to window
Zoom out
Zoom in

Annotations

33 errors
ubuntu-latest / ghc 9.8.2: src/Utils.hs#L19
Variable not in scope:
ubuntu-latest / ghc 9.8.2
Process completed with exit code 1.
windows-latest / ghc 9.2.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
windows-latest / ghc 9.2.8
The operation was canceled.
windows-latest / ghc 9.8.2
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
windows-latest / ghc 9.8.2
The operation was canceled.
windows-latest / ghc 9.6.6
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
windows-latest / ghc 9.6.6
The operation was canceled.
windows-latest / ghc 9.10.1
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
windows-latest / ghc 9.10.1
The operation was canceled.
ubuntu-latest / ghc 9.10.1
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
ubuntu-latest / ghc 9.10.1
The operation was canceled.
windows-latest / ghc 9.4.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
windows-latest / ghc 9.4.8
The operation was canceled.
ubuntu-latest / ghc 9.2.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
ubuntu-latest / ghc 9.2.8
The operation was canceled.
macOS-latest / ghc 9.2.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
ubuntu-latest / ghc 9.4.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
macOS-latest / ghc 9.2.8
The operation was canceled.
ubuntu-latest / ghc 9.4.8
The operation was canceled.
macOS-latest / ghc 9.6.6
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
macOS-latest / ghc 9.6.6
The operation was canceled.
ubuntu-latest / ghc 9.6.6
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
ubuntu-latest / ghc 9.6.6
The operation was canceled.
macOS-latest / ghc 9.4.8
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
macOS-latest / ghc 9.4.8
The operation was canceled.
macOS-latest / ghc 9.8.2
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
macOS-latest / ghc 9.8.2
The operation was canceled.
macOS-latest / ghc 9.10.1
The job was canceled because "ubuntu-latest_3_12_9_8_2" failed.
macOS-latest / ghc 9.10.1
The operation was canceled.
stack / ghc 9.10.1 (stack.yaml)
Process completed with exit code 1.
stack / ghc 9.10.1 (stack.os-string.yaml)
The job was canceled because "_9_10_1_stack_yaml" failed.
stack / ghc 9.10.1 (stack.os-string.yaml)
The operation was canceled.