Skip to content

feat!: PoC checking the node is validator on preblocker to bls key va… #32

feat!: PoC checking the node is validator on preblocker to bls key va…

feat!: PoC checking the node is validator on preblocker to bls key va… #32

Triggered via push January 15, 2025 08:29
Status Cancelled
Total duration 2m 13s
Artifacts

ci.yml

on: push
docker_pipeline  /  prepare-metadata
0s
docker_pipeline / prepare-metadata
e2e-docker-build-babylon
2m 2s
e2e-docker-build-babylon
e2e-docker-build-e2e-init-chain
2m 1s
e2e-docker-build-e2e-init-chain
lint_test  /  build
0s
lint_test / build
lint_test  /  lint
1m 51s
lint_test / lint
lint_test  /  unit-tests
1m 59s
lint_test / unit-tests
lint_test  /  integration-tests
0s
lint_test / integration-tests
lint_test  /  check-mock-gen
0s
lint_test / check-mock-gen
lint_test  /  gosec
0s
lint_test / gosec
proto_lint
23s
proto_lint
Matrix: docker_pipeline / docker_build
e2e-run-ibc-transfer
0s
e2e-run-ibc-transfer
e2e-run-btc-timestamping
0s
e2e-run-btc-timestamping
e2e-run-btc-staking
0s
e2e-run-btc-staking
e2e-run-btc-rewards
0s
e2e-run-btc-rewards
e2e-run-btc-staking-pre-approval
0s
e2e-run-btc-staking-pre-approval
e2e-run-upgrade-v1
0s
e2e-run-upgrade-v1
docker_pipeline  /  merge_dockerhub
0s
docker_pipeline / merge_dockerhub
docker_pipeline  /  merge_ecr
0s
docker_pipeline / merge_ecr
Fit to window
Zoom out
Zoom in

Annotations

11 errors
docker_pipeline / docker_build (linux/arm64, ubuntu-24.04-arm64)
Called workflows cannot be queued onto self-hosted runners across organizations/enterprises. Failed to queue this job. Labels: 'ubuntu-24.04-arm64'.
lint_test / lint
Canceling since a higher priority waiting request for 'ci-refs/heads/b-harvest/bls-2nd-pr-checking-validator-poc-ci' exists
lint_test / lint
The operation was canceled.
e2e-docker-build-e2e-init-chain
Canceling since a higher priority waiting request for 'ci-refs/heads/b-harvest/bls-2nd-pr-checking-validator-poc-ci' exists
e2e-docker-build-e2e-init-chain
The operation was canceled.
lint_test / unit-tests
Canceling since a higher priority waiting request for 'ci-refs/heads/b-harvest/bls-2nd-pr-checking-validator-poc-ci' exists
lint_test / unit-tests
The operation was canceled.
e2e-docker-build-babylon
Canceling since a higher priority waiting request for 'ci-refs/heads/b-harvest/bls-2nd-pr-checking-validator-poc-ci' exists
e2e-docker-build-babylon
The operation was canceled.
docker_pipeline / docker_build (linux/amd64, ubuntu-24.04)
Canceling since a higher priority waiting request for 'ci-refs/heads/b-harvest/bls-2nd-pr-checking-validator-poc-ci' exists
docker_pipeline / docker_build (linux/amd64, ubuntu-24.04)
The operation was canceled.