Skip to content

Some first change in a release-cycle from this repo #16

Some first change in a release-cycle from this repo

Some first change in a release-cycle from this repo #16

Triggered via pull request September 16, 2024 18:54
@HannesWellHannesWell
synchronize #2
dummy_change
Status Cancelled
Total duration 2h 37m 44s
Artifacts 3

ci.yml

on: pull_request
check-dash-licenses  /  check-licenses
1m 32s
check-dash-licenses / check-licenses
build  /  Upload Event File
4s
build / Upload Event File
Matrix: build / build
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
build / Verify Windows
The process 'C:\hostedtoolcache\windows\maven\3.9.7\x64\bin\mvn.cmd' failed with exit code 1
build / Verify MacOS
The process '/Users/runner/hostedtoolcache/maven/3.9.7/x64/bin/mvn' failed with exit code 1
build / Verify Linux
Canceling since a higher priority waiting request for 'Continuous Integration-refs/pull/2/merge' exists
build / Verify Linux
Runner GitHub Actions 17 did not respond to a cancelation request with 00:05:00.

Artifacts

Produced during runtime
Name Size
Event File Expired
2.74 KB
test-results-macos-13 Expired
1.13 MB
test-results-windows-latest Expired
1.2 MB