Skip to content

Merge pull request #379 from Gurobi/dependabot/pip/main/matplotlib-3.9.3 #764

Merge pull request #379 from Gurobi/dependabot/pip/main/matplotlib-3.9.3

Merge pull request #379 from Gurobi/dependabot/pip/main/matplotlib-3.9.3 #764

Triggered via push December 2, 2024 11:47
Status Failure
Total duration 6m 7s
Artifacts

push.yml

on: push
Matrix: build_push
Fit to window
Zoom out
Zoom in

Annotations

17 errors
build_push (3.9, gurobi11)
Process completed with exit code 1.
build_push (3.10, gurobi11)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.10, gurobi11)
Process completed with exit code 1.
build_push (3.10, gurobi12)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.10, gurobi12)
Process completed with exit code 1.
build_push (3.9, gurobi12)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.9, gurobi12)
Process completed with exit code 1.
build_push (3.9, gurobi10)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.9, gurobi10)
The operation was canceled.
build_push (3.10, gurobi10)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.10, gurobi10)
The operation was canceled.
build_push (3.12, gurobi12)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.12, gurobi12)
Process completed with exit code 1.
build_push (3.12, gurobi11)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.12, gurobi11)
The operation was canceled.
build_push (3.11, gurobi11)
The job was canceled because "_3_9_gurobi11" failed.
build_push (3.11, gurobi11)
The operation was canceled.