Releases: A2-Collaboration/travis-container-packets
Releases · A2-Collaboration/travis-container-packets
pluto6-master
Build Pluto 6 for ROOT 6 releases
cern-root-v6-10-08
Build of ROOT 6.10/08 using GCC 8.2.0.
Build done using Travis' Docker Image running Trusty which is the one we use online, same environment.
Automatic Travis build cancelled because the building takes more than one hour.
APLCONpp-gcc8.2
Build APLCONpp using new CMake 3.13.1 and GCC 8.2.0
gcc-8.2.0
Build of GCC 8.2.0
Build done using Travis' Docker Image running Trusty which is the one we use online, same environment.
Building more recent GCC versions takes a long time. This one on a (not so modern)
4 core machine takes roughly 2.5 hours. Travis jobs have a time limit of 50 minutes.
cmake-3.13.1
Build CMake 3.13.1
APLCONpp-master
Fix travis.yml
gsi-pluto-master
Add convenience script
gcc-4.9.2
cmake-3.1.2
Prevent building branches (tags only)
cern-root-v5-34-00-patches-A2
Adapt setup.sh to new tag name