Skip to content

Latest commit

 

History

History
35 lines (21 loc) · 1.67 KB

AssembleBody.md

File metadata and controls

35 lines (21 loc) · 1.67 KB

Body Assembly

These parts make up the box that serves as the rover's main body and equipment bay.

Estimated Time: 1 hour 15 minutes

Parts:

Body parts

Body rear

Body front

Body left

Body right

Note: Before attaching the rear body portion to the body sides, the last 4 of the Installation tools for 3 M3 nuts, 20mm apart should be installed in the top beam of the right and left body sides for future installation of the Differential End Pieces during the Suspension Differential Assembly. They are installed in the top and outside slots of the top beams.

Body joined

For proportion faithful to Curiosity rover side view seen in Onshape CAD file, there should be 62mm of aluminum extrusion visible between front face of "Rocker Body mount" and rear face of front "Body Corner".

In practice this can be moved forward/back as the builder pleases to maintain best balance for their rover chassis. Which will vary with every rover build as it depends on what's installed in equipment bay.