Replies: 2 comments 4 replies
-
The first time you run CE it reads the hub and creates "My Hub Model" based on the existing entities in the system. So if you edit or create entities in Hub Central, you can (re)start CE with: java -DforceInstall=true -jar hub-central-community-5.4.2.jar and this will re-initialize CE to recreate MyHub Model and you'll have the latest HC changes in Connect. You can then rename the model of course to be whatever it was previously. Hope this helps, |
Beta Was this translation helpful? Give feedback.
-
The plan is for the visual elements of CE not in HC to migrate into HC and then CE will eventually be deprecated. For now the best we have to offer is run in parallel. |
Beta Was this translation helpful? Give feedback.
-
Hi @wpaven
I am using CE 5.4.2 with DC 5.4.1 and I noticed something.
When I create entities from DC, and I have a model with a previous version of that entity in CE, when I load the model in CE, is there a way that this model sync with the DC version of the entity to reflect these changes, or are these separate needing manual changes ?
Rad
Beta Was this translation helpful? Give feedback.
All reactions