You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
When having the planner open and dragging an unscheduled Task over to the calendar on some slot in the future, nothing happens after releasing the mouse button.
I was expecting the task getting planned on the choosen time slot, but unfortunately there's nothing happening.
I can click on the Task and then use the button "Add Slot" to assign a time slot. But the drag&drop functionality would be faster and more convenient.
OS: Arch Linux x86_64 Kernel: Linux 6.10.5-arch1-1 WM: Hyprland (Wayland) Browser: Brave 1.68.134
The text was updated successfully, but these errors were encountered:
When having the planner open and dragging an unscheduled Task over to the calendar on some slot in the future, nothing happens after releasing the mouse button.
I was expecting the task getting planned on the choosen time slot, but unfortunately there's nothing happening.
I can click on the Task and then use the button "Add Slot" to assign a time slot. But the drag&drop functionality would be faster and more convenient.
OS: Arch Linux x86_64
Kernel: Linux 6.10.5-arch1-1
WM: Hyprland (Wayland)
Browser: Brave 1.68.134
The text was updated successfully, but these errors were encountered: