Skip to content

Latest commit

 

History

History
24 lines (22 loc) · 811 Bytes

path_to_v1.md

File metadata and controls

24 lines (22 loc) · 811 Bytes

This documents the missions steps to reach v1.0

Before the v1.0 release, we need to ensure that the following steps are completed. The list is a combination of the release checklist and the milestones that need to be completed.

Milestones

  • Make sure all tests pass
  • Merge Peter code
  • Verify AI Package
  • Verify Array package
  • Verify Bindings package
  • Verify EO Package
  • Verify Raster package
  • Verify Vector package
  • Verify Utils package
  • Built API for preprocessing and postprocessing EO -> AI data

Release checklist

  • Readme text
  • Check dependencies
  • Ensure all tests are written
  • Ensure all tests pass
  • Validate documentation
  • Update the version numbering
  • Upload to pip & conda