You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Jul 17, 2020. It is now read-only.
After each execution, we are creating new report with the status of the test executed. For failed test case, we are creating one more report after execution of the failed test cases. Is it possible to update the status of the existing test which is failed in the initial run in the same report ? Kindly help me is there any ways to do it.
Instead of having two reports, to combine both reports in same report
The text was updated successfully, but these errors were encountered:
Sign up for freeto subscribe to this conversation on GitHub.
Already have an account?
Sign in.
Summary
After each execution, we are creating new report with the status of the test executed. For failed test case, we are creating one more report after execution of the failed test cases. Is it possible to update the status of the existing test which is failed in the initial run in the same report ? Kindly help me is there any ways to do it.
Instead of having two reports, to combine both reports in same report
The text was updated successfully, but these errors were encountered: