Remove "Existing" Generator and PV O&M in the developer/owner costs, leave in BAU costs (3rd Party) #442

Open
Bill-Becker opened this issue Sep 19, 2024 · 0 comments
Labels
invalid This doesn't seem right

Comments

@Bill-Becker
Copy link
Collaborator

This is not a big deal because not many analyses include a lot of existing Generator and PV and O&M cost is often not a huge cost driver on total lifecycle cost, but:

Update optimization to only apply 3rd-party factor to newly-sized kW for O&M costs. Existing technology O&M costs should have offtaker PWF and tax factors applied to it.

We've updated the calcs in proforma.jl to be this way, but the optimization lumps existing Generator and PV O&M into the developers costs.

@Bill-Becker Bill-Becker added the invalid This doesn't seem right label Sep 19, 2024
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
invalid This doesn't seem right
Projects
None yet
Development

No branches or pull requests

1 participant